Case Study
Marine
Hydrophore Fabrication
It was requested by Client two new Hydrophores to replace on board the existing ones. The old heating boiler tubes are to be re-used.
The Hydrophore fabrication was carried out in STEP workshop.
Situation:
Fabrication of two new Hydrophores to replace on board the existing ones. The old heating boiler tubes are to be re-used.
Challenges:
Manufacturing of two Single-Shell Boiler (Water Heater Tanks), vertical type, in carbon steel, cylindrical shell with a semi-elliptical Heads type Klopper, according to the specifications received.