Estudos
Industrial
Buffer Tank
Calculation, design, and fabrication of a Buffer Tank according to DNV rules in a reduced time frame.
Situation:
STEP was requested to calculate, design, and fabricate a 1 x 40 m3 Buffer Tank according to DNV Rules.
Challenges:
- Rules requirements and approvals.
- Reduced time frame.
- Procurement team to comply with material delivery on time (12mm and 13mm steel plate P355NL2).