Estudos
Naval
Pipe work in dry dock
STEP was called with a reduced time frame to take action and perform repairs, pressure tests, and quality control for all the work done.
Situation:
LPG Tanker vessel in dry dock for Class renewal survey.
Challenges:
- Reduced time frame.
- Necessary materials delivered on time.
- Assurance of quality.