(+351) 212 742 817

Estudos

Petróleo & Gás

ITC Cyclone

Step was requested a turn-key solution for a new 5” schedule 80 pipe line to allow the ship to transport and supply jet fuel for helicopters in oil rigs.

Situation:

Step was requested to supply a turn-key solution for a new 5” schedule 80 pipe line to allow the ship to transport and supply jet fuel for helicopters in oil rigs.

Challenges:

  • Reduced time frame.
  • Level of Quality.
  • Multicultural environment.
  • Risk management.
  • Mitigation of variations of the initial baseline.
  • Correct initial site survey to optimize fabrication and reduce discrepancies during installation.

Porquê trabalhar connosco?

Garantia de qualidade e pessoal certificado