Case Study
Oil & Gas
ITC Cyclone
Step was requested a turn-key solution for a new 5” schedule 80 pipe line to allow the ship to transport and supply jet fuel for helicopters in oil rigs.
Situation:
Step was requested to supply a turn-key solution for a new 5” schedule 80 pipe line to allow the ship to transport and supply jet fuel for helicopters in oil rigs.
Challenges:
- Reduced time frame.
- Level of Quality.
- Multicultural environment.
- Risk management.
- Mitigation of variations of the initial baseline.
- Correct initial site survey to optimize fabrication and reduce discrepancies during installation.