(+351) 212 742 817

Case Study

Industrial

Incinerator repair

Incinerator refractory repair, on board a vessel berthed at Lisnave Shipyard –Setubal. Incinerator type ATLAS.

Situation:

The Incinerator had several damages on both combustion chambers refractory walls and burner dumper, which needed to be completely rebuilt.

Challenges:

  • The  equipment was  opened and dismantled.
  • the old refractory was broken and removed.

Why Work With Us?

Assurance of quality and certified personnel