Case Study
Industrial
Incinerator repair
Incinerator refractory repair, on board a vessel berthed at Lisnave Shipyard –Setubal. Incinerator type ATLAS.
Situation:
The Incinerator had several damages on both combustion chambers refractory walls and burner dumper, which needed to be completely rebuilt.
Challenges:
- The equipment was opened and dismantled.
- the old refractory was broken and removed.
